New Mesa Thread
#2042
Line Holder
Joined APC: Jul 2015
Posts: 73
Command leadership is the same and systems will be similar. I think the 175 FPT is longer than the CRJ now, but I'm not sure. If so, it's only a couple of days difference. The CRJ also has some differences training that the 175 doesn't have. Same amount of sims, so a pretty similar footprint overall.
#2044
Gets Weekends Off
Joined APC: Dec 2013
Position: men without hats
Posts: 371
I'm betting they all go to IAH.
#2046
Gets Weekends Off
Joined APC: Sep 2015
Posts: 311
Just curious as why opposed to IAH?
Sent from my iPad using Tapatalk
Sent from my iPad using Tapatalk
#2049
sippin' dat koolaid
Joined APC: Jun 2013
Position: gear slinger
Posts: 982
Length: A couple of days of command leadership followed by 3 weeks of systems, 6 days of ground FPT, 2 days of FPT in the sim, 8 sims, check ride, LOFT.
Location: All ground training is done in PHX, door pulls in Orlando. Sim is mostly DFW with some YYZ. STL may come back into the picture as the new aircraft likely come with FSI entitlements, but not sure when that will happen.
Location: All ground training is done in PHX, door pulls in Orlando. Sim is mostly DFW with some YYZ. STL may come back into the picture as the new aircraft likely come with FSI entitlements, but not sure when that will happen.
So let's say that you are a PHX FO awarded E175 CA...does the company still consider you PHX based throughout the transition? I'm a PHX based commuter and am not interested in paying for my own lodging and transportation for 3-4 weeks while attending ground school. I may transfer to DFW or IAD of that is the case.
#2050
Thanks for the breakdown. And one more question if anyone can shed some light on this...
So let's say that you are a PHX FO awarded E175 CA...does the company still consider you PHX based throughout the transition? I'm a PHX based commuter and am not interested in paying for my own lodging and transportation for 3-4 weeks while attending ground school. I may transfer to DFW or IAD of that is the case.
So let's say that you are a PHX FO awarded E175 CA...does the company still consider you PHX based throughout the transition? I'm a PHX based commuter and am not interested in paying for my own lodging and transportation for 3-4 weeks while attending ground school. I may transfer to DFW or IAD of that is the case.
Thread
Thread Starter
Forum
Replies
Last Post