Old 08-29-2021, 01:37 PM
  #681  
Gets Weekends Off
 
Joined APC: Sep 2015
Posts: 311
Default Mesa 4.0 what’s the latest

Originally Posted by coodrough568
its not years away. An Embraer exec himself said they are assembling the new AA 175s for Mesa right now. They are already in production. The company should break the news on the Q3 earnings call

What base are they slated for? Any DEC slots for them if you have a 170/90 type already? At the ‘voy now but gotta think about this news. May be a good idea to catch that hiring wave now ya know?


Sent from my iPhone using Tapatalk
Inclined plane is offline  
Old 08-29-2021, 04:22 PM
  #682  
Gets Weekends Off
 
Joined APC: Dec 2013
Posts: 1,602
Default

Originally Posted by Inclined plane
What base are they slated for? Any DEC slots for them if you have a 170/90 type already? At the ‘voy now but gotta think about this news. May be a good idea to catch that hiring wave now ya know?


Sent from my iPhone using Tapatalk

hes a troll don’t listen to anything he says. There are no DEC at Mesa you can bid captain and take it when your seniority comes up. But shouldn’t be too long.
NovemberBravo is offline  
Old 08-29-2021, 04:24 PM
  #683  
Gets Weekends Off
 
Joined APC: Dec 2013
Posts: 1,602
Default

Originally Posted by flyboy043
Hey do you guys have any training delays?
I heard second hand that there are about to be massive delays I’ll let someone else confirm if that’s true or not.
NovemberBravo is offline  
Old 08-29-2021, 04:26 PM
  #684  
On Reserve
 
Joined APC: Jan 2018
Posts: 14
Default

Originally Posted by NovemberBravo
I heard second hand that there are about to be massive delays I’ll let someone else confirm if that’s true or not.

What did you hear? What’s about to happen causing massive delays?
blinkidy is offline  
Old 08-29-2021, 04:50 PM
  #685  
New Hire
 
Joined APC: Mar 2021
Posts: 8
Default

Long story short, there are not enough sim instructors ready to train on the Ejet side as we just lost a bunch to mainline carriers, so there are delays getting guys through the sim while they train more sim instructors, current classes are expecting 1-2 months delay for sims. On the other hand we have a second Ejet sim being installed in phx. In theory they should be able to catch up once the sim is up and there are more instructors trained.

No delays on CRJ side that I know of.

Source: I am currently in training
ParadoxT is offline  
Old 08-29-2021, 05:21 PM
  #686  
Gets Weekends Off
 
Joined APC: Feb 2017
Posts: 337
Default

Originally Posted by ParadoxT
Long story short, there are not enough sim instructors ready to train on the Ejet side as we just lost a bunch to mainline carriers, so there are delays getting guys through the sim while they train more sim instructors, current classes are expecting 1-2 months delay for sims. On the other hand we have a second Ejet sim being installed in phx. In theory they should be able to catch up once the sim is up and there are more instructors trained.

No delays on CRJ side that I know of.

Source: I am currently in training
that new Ejet sim won’t be operational til after the new year. After it’s built it needs to be certified. Hopefully that can be expedited.
jetlag q is offline  
Old 08-29-2021, 05:41 PM
  #687  
Line Holder
 
Joined APC: Jul 2021
Posts: 29
Default

Originally Posted by ParadoxT
Long story short, there are not enough sim instructors ready to train on the Ejet side as we just lost a bunch to mainline carriers, so there are delays getting guys through the sim while they train more sim instructors, current classes are expecting 1-2 months delay for sims. On the other hand we have a second Ejet sim being installed in phx. In theory they should be able to catch up once the sim is up and there are more instructors trained.

No delays on CRJ side that I know of.

Source: I am currently in training
Thank you man
flyboy043 is offline  
Old 08-31-2021, 08:54 AM
  #688  
Line Holder
 
Joined APC: Oct 2019
Posts: 46
Default

Is Mesa opening a crew/MX base at MCI? Looks like they’re running ads for mechanics and other personnel?
Prop LT is offline  
Old 08-31-2021, 11:11 AM
  #689  
Line Holder
 
Joined APC: Aug 2021
Posts: 63
Default

Originally Posted by Prop LT
Is Mesa opening a crew/MX base at MCI? Looks like they’re running ads for mechanics and other personnel?
Maybe for the cargo operation. I think the ejet only has 1-2 aircraft there a night
GuppyDreamer is offline  
Old 08-31-2021, 01:27 PM
  #690  
Gets Weekends Off
 
Joined APC: Nov 2016
Posts: 890
Default

Originally Posted by coodrough568
This is the problem at Mesa. None of our pilots have faith in what we can accomplish. We have some of the sharpest, most professional pilots in all of aviation (and I’m including the legacy groups too). J.O.
ha ha ha. Funniest thing I’ve ever read here.
domino is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
hdale
Regional
8
08-26-2021 11:49 PM
Flying Ninja
Mesa Airlines
57
02-22-2016 04:36 PM
cat22planes
Career Questions
20
02-12-2015 07:18 AM
32LTangoTen
Regional
3
11-19-2011 09:25 PM
Lbell911
Regional
13
12-28-2007 08:21 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices