Re comments on accelerating narrow body deliveries, I don't think either Airbus nor Boeing can deliver A321's and B737-900ER's any faster during 2015 than already scheduled. However the final 36 717's that Southwest (AirTran) parked at year end 2014 and which were planned to enter the Delta fleet at the rate of 3 per month during 2015, will IMHO, have a faster ramp up, with the effort to have all 36 ''up and running'' by end of summer time. The larger classes in January seem to indicate this, and I think we will hear reports of the mods from AirTran 717 to Delta standard MD-95 :-) configuration being accelerated in the next few weeks.
Coronado is offline  
Old 01-09-2015, 07:08 AM
  #175472  
Get's Every Day Off
 
ExAF's Avatar
 
Joined APC: Oct 2006
Position: Retired
Posts: 1,860
Default

Originally Posted by porpilot
Can't swap. I've tried all month. I'm a line holder and looking at bidding reserve due to a sweet Feb vacation 12 days(sarcasm). Reserve guarantee is 74.30 in Feb and trying to figure out if it goes above guarantee and worth bidding reserve. Seems I will have 7 days on call if I bid reserve. Just wondering pay. Thanks
The good news is you will only have to sit 6 days on call since you are already flying one of them. The bad news is no extra pay, just credit and raw score.
ExAF is offline  
Old 01-09-2015, 07:19 AM
  #175473  
Gets Weekends Off
 
Joined APC: Feb 2008
Posts: 19,599
Default

Originally Posted by Scoop
Actually a LAX Guy (could have been a FE or FO) got fired in the 90's for showing up and attempting to fly a whole rotation with no shoes. True story, although I may be off a little on some of the details. This is one of the base "Folklore" stories that we are told in LAX - along with the CAPT that threw the TV out of the window and, the Female CAPT that someone called security on because they thought she was a hooker in the crew room.

He said something like he was sitting SC and on the beach and his stuff got stolen. Shows up with no shoes. CAPT says - I will do the Walk-arounds today, stay in the cockpit and tonight on layover get a new pair.

Shows up day 2. No shoes. CAPT says what happened. FO//FE guy says I didn't have enough money to buy shoes. They repeat the same drill on day 2 but this time the CAPT lends the guys money to buy shoes.

Shows up day 3 with no shoes. CAPT has enough. All Pilots report to CPO after trip. Guy gets fired. I don't know if this guy actually had mental issues or some shoe phobia but this is a true story.

Scoop
It is a true story however it was 1987. A CA did throw a TV out the window of the Hotel in HNL. He had good reason!
sailingfun is offline  
Old 01-09-2015, 07:45 AM
  #175474  
Gets Weekends Off
 
redship's Avatar
 
Joined APC: Dec 2010
Position: MD FO
Posts: 107
Default C2015 opener

It seems some folks are surprised the MEC said they will release the C2015 opener. They did the same for C2012 but keep in mind it was extremely vague. Here is what was in our C2012 opener under the compensation section:

• Significantly increase hourly rates of pay
• Provide for retroactive pay and benefits to the amendable date (if necessary)
• Increase international pay and cover all operations outside the 48 contiguous states
• Establish MED pay
• Establish holiday pay
• Improve the Profit Sharing Plan
redship is offline  
Old 01-09-2015, 08:15 AM
  #175475  
Gets Weekends Off
 
Jughead135's Avatar
 
Joined APC: Sep 2011
Position: Hates Commuting
Posts: 957
Default PBS question

As I look at the Feb schedule, lots of things have changed (largely for the better, IMO & specific to my situation). I also see several situations that make me wonder the following:

Will PBS award a bid for two pairings that, if combined into a single pairing would be legal, but as two separate pairings would not be legal (not enough rest between)?

For example: 2-day trip blocks in at 1000L after a 0730 report to a one-leg duty period; 3-day trip checks-in at 1200L for a one-leg duty period blocking in 1500L. Obviously <10 hours between them (1030 - 1200 = 1.5 hours), so not legal rest. However, plenty of 4-day trips have a 3-hour sit in between two legs for an 8-hour duty day, as this would be if you put the two trips together. Will PBS allow this (in effect "building" a 4-day out of a 2+3 day), or would one or the other trip be denied for legal rest once the first trip is added?
Jughead135 is offline  
Old 01-09-2015, 08:24 AM
  #175476  
Gets Weekends Off
 
Joined APC: Aug 2006
Position: A330 First Officer
Posts: 1,465
Default

Originally Posted by Jughead135
As I look at the Feb schedule, lots of things have changed (largely for the better, IMO & specific to my situation). I also see several situations that make me wonder the following:

Will PBS award a bid for two pairings that, if combined into a single pairing would be legal, but as two separate pairings would not be legal (not enough rest between)?

For example: 2-day trip blocks in at 1000L after a 0730 report to a one-leg duty period; 3-day trip checks-in at 1200L for a one-leg duty period blocking in 1500L. Obviously <10 hours between them (1030 - 1200 = 1.5 hours), so not legal rest. However, plenty of 4-day trips have a 3-hour sit in between two legs for an 8-hour duty day, as this would be if you put the two trips together. Will PBS allow this (in effect "building" a 4-day out of a 2+3 day), or would one or the other trip be denied for legal rest once the first trip is added?
I think you already know the answer to this but NO!
DALMD88FO is offline  
Old 01-09-2015, 08:26 AM
  #175477  
Gets Weekends Off
 
Joined APC: Jul 2008
Posts: 5,016
Default

Originally Posted by redship
It seems some folks are surprised the MEC said they will release the C2015 opener. They did the same for C2012 but keep in mind it was extremely vague. Here is what was in our C2012 opener under the compensation section:

• Significantly increase hourly rates of pay
• Provide for retroactive pay and benefits to the amendable date (if necessary)
• Increase international pay and cover all operations outside the 48 contiguous states
• Establish MED pay
• Establish holiday pay
• Improve the Profit Sharing Plan
We failed the last 3 goals and decreased profit sharing plan. Why did we sign early again?
hockeypilot44 is online now  
Old 01-09-2015, 08:29 AM
  #175478  
Gets Weekends Off
 
Joined APC: Dec 2009
Position: Capt
Posts: 2,049
Default

Any easy way, sans bid packets, to see the 330 destinations?

Thinking about sandbagging again!

I know BOM is gone, but not a fan of Africa flying. Is there a list, particularly JFK departures?
boog123 is offline  
Old 01-09-2015, 09:12 AM
  #175479  
Gets Weekends Off
 
Joined APC: Apr 2008
Position: DAL FO
Posts: 2,169
Default

Originally Posted by hockeypilot44
We failed the last 3 goals and decreased profit sharing plan. Why did we sign early again?
I signed early (voted yes) because the good outweighed the bad IMO. That's all any of us can do as individuals. I'm still happy with my decision, especially since we are now negotiating from a much higher position less than 2.5 years later. Given the historical, glacial pace of Section 6 negotiations we could easily still be talking about C2012. I'm pleased that we aren't. You clearly came to a different decision given the same set of facts and that is fine.

Regarding your post above, do you expect us to get everything we open with?

Does it surprise anyone that management might (probably) want to reduce or eliminate profit sharing? Will they get everything that they open with?

It's called a negotiation for a reason, and it doesn't officially begin for almost another 3 months. Anything else you hear at this point is speculation/rumor mill.
LeineLodge is offline  
Old 01-09-2015, 10:12 AM
  #175480  
Gets Weekends Off
 
Joined APC: Oct 2009
Posts: 3,108
Default

Originally Posted by LeineLodge
I signed early (voted yes) because the good outweighed the bad IMO. That's all any of us can do as individuals. I'm still happy with my decision, especially since we are now negotiating from a much higher position less than 2.5 years later. Given the historical, glacial pace of Section 6 negotiations we could easily still be talking about C2012. I'm pleased that we aren't. You clearly came to a different decision given the same set of facts and that is fine.

Regarding your post above, do you expect us to get everything we open with?

Does it surprise anyone that management might (probably) want to reduce or eliminate profit sharing? Will they get everything that they open with?

It's called a negotiation for a reason, and it doesn't officially begin for almost another 3 months. Anything else you hear at this point is speculation/rumor mill.
We lose money management wants concessions. We make money management wants concessions. We make massive record profits management wants concessions.

Do concessions make sense in C2015?

I think we have lost our way.
gzsg is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
On Autopilot
Regional
22594
11-05-2021 07:03 AM
AeroCrewSolut
Delta
153
08-14-2018 12:18 PM
Bill Lumberg
Major
71
06-13-2012 08:36 AM
Quagmire
Major
253
04-16-2011 06:19 AM
JiffyLube
Major
12
03-07-2008 04:27 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices