Prepare yourselves… 2023 AEs
#2473
I pick B.
A) June 16 AE, July 3rd results, First conversion in August
B) June 23 AE, July 7th results, First conversion in August.
C) None of the above
Late June AE, July
A) June 16 AE, July 3rd results, First conversion in August
B) June 23 AE, July 7th results, First conversion in August.
C) None of the above
Late June AE, July
#2480
What will be interesting (assuming mid Jun23 AE) will be the timeline, as in duration. NH slots dry up right around September, so we need an AE but will we truly have smaller ones in short duration or a massive fall AE with a long time horizon to prep for summer? The new PWA makes “latest AE” a new thing where running a big AE takes a long timeline, but then latest AE award counts so we could have a bunch of NB-B bid WBB, company plans accordingly… then those pilots bid NBA on the next award and the company is left without pilots for WBB slots; requiring another AE, generating churn, etc.
Interested to see it, and it must happen by July for the hiring plan to be able to work in any method of AE.
Interested to see it, and it must happen by July for the hiring plan to be able to work in any method of AE.
Thread
Thread Starter
Forum
Replies
Last Post