Any "Latest & Greatest about Delta?" Part 2
#1712
Suppose I want to drop a multi-day trip with a high time day 1 using a PB day, and the coverage is negative on at least 1 day. I read the Scheduling notepad but have a question. If I use an APD on the last day I know it will drop the whole trip and I can pick up on any day but the last day. DoI use the smartsheet to put a PB day on day 1? Is it automatic or is there some approval needed?
Basically I am looking for some feedback from folks who have done this and looking for any pointers or possible issues to avoid.
Thanks Scoop
Basically I am looking for some feedback from folks who have done this and looking for any pointers or possible issues to avoid.
Thanks Scoop
#1713
Gets Weekends Off
Joined APC: Mar 2020
Position: Pro happy
Posts: 273
PBS Question
If I sort through the bid package and identify 50-ish pairings that I wouldn’t mind flying, how do I structure my bid to tell the system to build me a schedule from only those pairings?
#1714
Gets Weekends Off
Joined APC: Jun 2015
Posts: 1,757
Award trip XXXX departing On Mar XX, followed by…Award trip YYYY departing On Mar YY, followed by etc.
Put the pairings in the order you want, all 1 line. Put that line ahead of all your other avoids and awards.
#1715
If you truly don't care which one of the 50 you get, then you could simply just click the plus sign at the top, then click the check box beside the line that shows all your filters (a banner just above the first pairing) then click the award button. I think PBS will allow you to add a line with up to 7 "if statements." Otherwise, I'd just add all the filters line-by-line, in the hierarchy you prefer.
#1716
The easiest way is to sort the trips you want in the pairings tab and select them one at a time to add to the bid, you can go back to the bid tab and move them around later.
#1717
Gets Weekends Off
Joined APC: Mar 2020
Position: Pro happy
Posts: 273
If you truly don't care which one of the 50 you get, then you could simply just click the plus sign at the top, then click the check box beside the line that shows all your filters (a banner just above the first pairing) then click the award button. I think PBS will allow you to add a line with up to 7 "if statements." Otherwise, I'd just add all the filters line-by-line, in the hierarchy you prefer.
#1719
Gets Weekends Off
Joined APC: Mar 2020
Position: Pro happy
Posts: 273
This might be better. I had a question about using the clear schedule instruction. Will PBS try to shuffle all 50 trips in order to build a valid schedule or will it go through the listed trips, award them if available, and reach the end and jump to the next bid group. For example, If I list the trips by length…5, 4 3 2 1; and PBS awards two five day trips. Then it gets to the 4-day trips, but those would all exceed the LCW when added to the two 5-day trips. Then there are no trips available of 3 days or less. Before PBS executes the clear schedule instruction, will it circle back and try to award only one of the five day trips plus two 4-day trips to get in the LCW or jump to the next bid group?
Thread
Thread Starter
Forum
Replies
Last Post