Search

Notices

Reserve reroute pay

Thread Tools
 
Search this Thread
 
Old 05-10-2017, 03:03 PM
  #1  
New Hire
Thread Starter
 
Joined APC: Jul 2014
Position: MD88B
Posts: 5
Default Reserve reroute pay

How is reserve reroute pay (into an X day) calculated?

For example, assume:
  • A 4 day trip that is scheduled to end at 2000 with a deadhead on day 4 back to base.
  • Due to a delay on the second to last day, the last fight back to base departed before the reserve's second to last leg arrived. They ended up going to a hotel.
  • The reserve was extended into an X day to return to base and was released at 0900 on day 5 via a 2:00 deadhead.

Is there reroute pay above guarantee and if so how is it calculated? (section 23.L.9 was confusing to me)

Is a payback day added to the reserve's schedule much like a GS payback day?

Thanks!
widget59 is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Crawl
CommuteAir
5406
03-21-2020 07:45 AM
notEnuf
Delta
238
12-22-2015 05:20 AM
FedElta
Cargo
87
07-17-2015 08:26 AM
glyde
Major
120
11-11-2011 03:31 PM
AAflyer
Major
42
05-13-2007 06:48 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices